VMware vSphere Enterprise Plus and Site Recovery Manager PDMS II Project

 

Year of the project: 2012 – 2013
Products: VMware vSphere Enterprise Plus, vCenter Standard.
Project Description: Installing VMware vSphere enterprise plus and setting up a DR site between two locations in Khafji using SRM on NetApp storage.

   

Migration from Physical to Virtual on VMware for PTCI Project

 

Year of the project: 2013
Products: VMware vSphere Enterprise Plus, vCenter Standard, Veeam Management Suite Enterprise Plus.
Project Description: Installing VMware vSphere enterprise plus and migrating physical servers to virtual environment. Setting up Veeam backup and Veeam ONE.

 

Building Disaster Recovery Site On VMware and Veeam

 

Year of the project: 2016
Products: VMware vSphere Enterprise Plus, vCenter Standard, Veeam Management Suite Enterprise Plus.
Project Description: This project was phase 2 of a previous project to create a disaster recovery site, this project includes extending the same network to the DR site and successful failover for the protected virtual server.

SharePoint Migration Project

Year of the project: 2013
Products: SharePoint 2013
Project Description: Migration from SharePoint 2007 to SharePoint 2013, this project was done in partner with our Turkish partners in Turkey.

VMware View (Thin Client)

Year of the project: 2012
Products: VMware View
Project Description: VMware view (thin client) for remote users.

Installation and Configuration of Veeam Backup and Replication

Year of the project: 2015
Products: Veeam Backup and Replication Enterprise Plus
Project Description: Successfully do the right sizing and plan the implementation with design and scope documentation for three sites Jubail, Dhahran, and Khobar. The project involved the implementation of a DR site. The project implemented successfully with very high customer satisfaction.

Migration from Physical to Virtual Environment on VMware vSphere

Year of the project: 2013
Products: VMware vSphere Essential Plus
Project Description: Installing and configuring the virtual environment on VMware, migrating the phsyical environment to the virtual setup on VMware vSphere.

Installing and Configuring Veeam Solutions on VMware vSphere

Year of the project: 2014
Products: Veeam Backup and Replication and Veeam ONE
Project Description: Installing and configuring Veeam Backup and Replication as a backup solution on physical server and configuring replication to a remote storage as a DR solution. Configuring Veeam ONE.

Building LICC Datacenter on VMware, Installing and Configuring email system on Microsoft Exchange 2013.

Year of the project: 2013
Products: VMware Essential Plus, Microsoft Windows Server, Microsoft Exchange, Dell Servers, Equalogic Storage.
Project Description: Building Datacenter, installing and configuring VMware vSphere, Installing and Configuring Exchange Server, migrating emails from Bahrain domain to a Saudi domain.

Installing and Configuring the ERP system on Microsoft Dynamics AX.

Year of the project: 2013-2014
Products: Microsoft Dynamics AX.
Project Description: Designing, Configuring and Installing Microsoft Dynamics AX ERP system for The entire company.

Veeam Backup and Replication and Veeam ONE

Year of the project: 2013
Products: Veeam Management Suite Enterprise.
Project Description: Veeam Backup for Microsoft Hyper-V for the entire virtualize environment and Veeam ONE.

Veeam Backup and Replication and Veeam ONE

Year of the project: 2014
Products: VMware vSphere Enterprise and Veeam Management Pack Suite Enterprise
Project Description: Installing and configuring Veeam Backup and Replication as a backup and replication to remote site solution and installing and configuring Veeam ONE for VMware environment.

VMware vSphere Migration from vSphere 4.0 to vSphere 5.5

Year of the project: 2014
Products: VMware vSphere Enterprise Plus
Project Description: Successfully upgrading VMware vSphere 4.0 to VMware vSphere 5.5 on the existing hardware including the virtual distributed switches with zero downtime. Migrating and upgrading vCenter server from Oracle database to Microsoft SQL server on the same physical server.

Veeam Backup and Replication and Veeam ONE

Year of the project: 2014
Products: VMware vSphere Enterprise, Veeam Management Suite Enterprise Plus, HP Blade Servers, EMC VNX Storage.
Project Description: Successfully installing EMC VNX storage, installing HP Blade servers, installing and configuring Veeam Backup and Replication on physical server to take the backup directly through SAN switch, installing and configuring VMware vSphere 5.5 on the blade servers along with vCenter as per VMware best practices, migrating physical and virtual servers to the new virtual environment.

Veeam Backup and Replication and Veeam ONE

Year of the project: 2015
Products: Veeam ONE (Virtual Environment Monitoring and Reporting Tool)
Project Description: Successfully installing and configuring Veeam ONE monitoring and reporting tool to monitor SEC virtual environment on the four major locations, Riyadh, Dammam, Jeddah, and Abha.

VMware vSphere 5.5 Installation and Physical to Virtual Migration

Year of the project: 2015
Products: VMware vSphere
Project Description:Successfully installing and configuring VMware vSphere and vCenter 5.5, migration of physical servers to virtual without any downtime or corruption of any VMs. The project was successfully implemented as per the agreed scope and with high customer satisfaction..

Hardware, VMware vSphere and Veeam Project

Year of the project: 2015
Products: VMware vSphere, Veeam Backup and Replication, HP DL 380 Servers
Project Description: Successfully size the right hardware for virtualization of the environment, successful time delivery for the hardware, and successful execution of the project of implementing VMware vSphere and migration of physical to virtual without any downtime or servers’ corruptions. Successful implementation of Veeam Backup and Replication.

Veeam Backup and Replication Project

Year of the project: 2015 – 2016
Products: Veeam Backup and Replication Enterprise and Veeam ONE
Project Description: Successful sizing of the environment and successful implementation of Veeam Backup and Replication Enterprise for Microsoft Hyper-V. Successful Implementation of Veeam ONE with all reported required to meet the agreed SLAs.

Druva inSync Enterprise Edition OnPremise Project

Year of the project: 2017
Products: Druva inSync Enterprise Edition
Project Description: Successfuldeployment of Druva inSync Enterprise Edition for 1000 users where all desktopsm laptops and mobile devices are backed up and every user has the ability to restore his backup as a self-service which reduced the IT overhead.

VMware vSphere Upgrade

Year of the project: 2017
Products: VMware vSphere Enterprise
Project Description: Successful upgrade of the existing VMware setup to vSphere 6.5 with zero downtime, this includes the upgrade of the vCenter server andall distributed switches.